The Stronghold Security Tower will protect security forces from the detonation of a very large VBIED at close range (blast pressures exceeding 1622psi). Tower construction. The primary construction material is a unique steel "microtruss" system, designed, built and tested in collaboration with Cellular Materials International.
Modular design enhances ease of transportation and installation (total installation time is less than 14 days), and site design flexibility. Observation deck is constructed of ballistic rated AR armor plate steel and can be modified to 12.7AP or 14.5API protection levels.
Modular design enhances ease of transportation and installation (total installation time is less than 14 days), and site design flexibility. Observation deck is constructed of ballistic rated AR armor plate steel and can be modified to 12.7AP or 14.5API protection levels.
Services
Nationwide Structures offers a diverse line of products providing many cost effective means for controlling vehicle access. Ranging from simple Drop Arm Gates for access control, to net based automatic energy absorbing systems that can be used for multiple lane access points or daisy-chained together for perimeter security around large areas such as runways, warehousing, docks, manufacturing, or other facilities.
Upgrade your existing Entry Control Points (ECP), machine gun emplacements and fighting positions from the concrete barriers, water-filled barrels or sandbags you're now using, to the patented STS armored security barriers. The latest technology in ballistic rated armor protection. This armored shield barrier system is modular in design and can be arranged in any size or configuration required to meet your mission requirements or changing threat conditions.An upgraded ECP provides better visibility and protection for personnel, and can be easily reconfigured or relocated as your requirements change.
Structure blast ratings and ballistic ratings to meet any installation criteria. Complete line of structures, booths, doors, and windows that meet forced entry requirements from 5 to 60 minutes. Combined Threat Structures providing ballistic rating, blast resistance, and forced entry protection together, or in any combination.
While still providing the standard unrated buildings offered since 1986, new innovative design solutions have expanded the product line to include higher ballistic rated booths and buildings. NSI's ballistic rated NIJ IV AGS Assemblies are currently being utilized by U.S. Military units in remote areas around the world.
Reviews
Be the first to review Nationwide Structures.
Write a Review